Fees Schedules
Search
Filter
Aditional Plan Review
This fee shall be paid for the review of plans when changes are made to the plans that have been previously approved.
Plan Review Fee $140: |
Work Without a Permit or Approval
This fee is assessed whenever any work that requires a permit by the fire department has begun prior to obtaining a permit.
All fees are doubled.
- add this to your cart so that it’s noted on your receipt.
- find the permit fee that was skipped and add it twice to your cart.
Work Without A Permit: |
Removal of Stop Work Order
This fee shall be assessed to remove a “Stop Work Order” issued by the fire department.
1st Offense: $140
Double the previous fine thereafter
1st Offense $140: | |
2nd Offense $280: | |
3rd Offense $560: | |
4th Offense $1120: |
After Hours Inspection
This fee shall be assessed whenever, at the request of a contractor or building owner, the fire department performs an inspection before or after normal business hours of 08:00 and 16:00, Monday – Friday, or anytime on weekends.
Inspection Fee $175: |
Re-inspection Fee
This fee shall be assessed for each re-inspection when: an inspection is called and is not complete when the inspector arrives; corrections called out on a previous inspection are not made; the contractor does not have the permit card; or, the plans are not available for inspector.
Inspection Fee $140: |
Temporary Access Road Agreement
This fee is required to obtain a construction permit to install a temporary access road in compliance with fire department standards for a specific time period.
30-Day Permitting Fee $28: | |
60-Day Permitting Fee $140: | |
90-Day Permitting Fee $246: |
Spray Booths, Spray Rooms or Mixing Rooms
This fee is required to obtain a construction permit to install booths or equipment, or construct rooms used for mixing, spraying dipping or drying of flammable or combustible liquids.
Permitting Fee $246: |
Refrigeration Equipment
This fee is required to obtain a construction permit to install a refrigeration system regulated by the fire code.
Permitting Fee $246: |
Medical Gas System
This fee is required to obtain a permit to install LP gas system or containers permanently, or for a period of less than six months.
Permitting Fee $246: |
LPG Installation Permanent or Temporary
This fee is required to obtain a permit to install LP gas system or containers permanently, or for a period of less than six months.
Permitting Fee $246: |